by LE | Jun 13, 2019 | Lindemann Engineering
Big heavy duty shelf’s, floor mats, un-necessary stuff gone. Space limitations = don’t save stuff you don’t use. I’ve started work on the F1 to be ready to race with WERA @ Willow this month.
by LE | Jun 12, 2019 | Lindemann Engineering
Moving into and setting up a new shop is 3D life size Tetris!
by LE | Jun 5, 2019 | Lindemann Engineering
The big stuff is moved in. The small stuff will take longer to arrange and I still have too much stuff to fit in. Because I want the F1 ready to race by the end of this month, the paint, floor and wiring will have to wait.
by LE | May 14, 2019 | Lindemann Engineering
I’m setting up my 8th shop space. This time in a 2.5 car garage. I plan to have LE moved in by the end of May so I can prep a bike for the WERA Willow weekend at the end of June. The new garage door is just one of the steps.
by LE | May 14, 2019 | Lindemann Engineering
I crewed my first car race. Many things are the same but different than motorcycle racing, like how they return damaged race conveniences back to the pits.