by LE | Aug 27, 2019 | Lindemann Engineering
A lathe is a useful tool. Now the MRX wheel fits the SV. Also, adding two shelf’s and organizing let me empty 5 boxes of stuff for more shop space.
by LE | Aug 25, 2019 | Lindemann Engineering
The Drag Bars are on. Boring the MRX wheel spacers to fit this axle is all that was needed on the left side, the sprockets line up and the wheel is centered. The Air Tech catch lower is ready to install. You can see the new shop shelf’s. There are also Factory...
by LE | Aug 16, 2019 | Lindemann Engineering
The M-4 pipe was not exhausting to install.
by LE | Aug 11, 2019 | Lindemann Engineering
$500, used with DLC & LE valving.
by LE | Aug 11, 2019 | Lindemann Engineering
$300 for all of them.