(909) 838-4587 ed [at] le-suspension.com

Welding Table and Sink. I painted this part of the floor, added wiring and plumbing, then replaced and painted the drywall. The table is covered with 1/8 thick steel and mounted to the floor and wall. Next step is to cut a board to cover the sink for extra work space. When not in use the board will live between the sink and washer. The pull out faucet reaches the swamp cooler that parks in front the the table. Still to do: shelf for the radio, hang LED light over the work space, trophy shelf, above washer & dryer. Then it will be time to paint the rest of the floor.