Phase II of the Lindemann Engineering trailer set up is under way. In order to make it easier to work on forks and shocks at the track I need a suspension work station in the LE trailer. Smiling Albert Monge, owner and operator of Custom Steel Fabrication, did a great job. Tomorrow I paint. You can reach Albert at 760 912-7907 and/or amonge91@aol.com