(909) 838-4587 ed [at] le-suspension.com

  My new suspension table is about half way done.  It will have a metal top with a lip all the way around to prevent spills.  The vice will go on the angled part.  The back half of the lower table will be a sink that will drain into a bucket.  To the left will be the solvent tank and to the right the Flat Stone.

I’ve been working at my other work bench for now but that means I can only do one thing at a time.  Of course the floor had to have new paint to go along with the new table.