Are you Ready?!
LE
Porting and Deck Height
Deck Height is how you adjust a two stroke port timing by changing the thickness of the base gaskets. This tool uses two dial gauges to average out the wobble of the piston. The tool that looks like a dentist drill is being used to chamfer the edges of the ports so the piston ring is pushed into it’s grove gently.

Gear Tool
’99 TZ250 rebuild. It’s been a long time but I still have the aluminum bolt I used to lock the crank gear so I can torque the crank bolt.
Mystery School File
This is the box of all LE Knowledge. These files are what I did to every bike I’ve worked on. There are now so many bikes in the Mystery School Fleet that they have moved out of the Yamaha file and into their own file. The other photo is of two TTR230 shocks being rebuild and re-vlaved together.

Billy’s TZ250
Roland Cushway did the crank rebuild so now it’s time to put Billy’s engine together.
Suspension Vendor
Brady Walker called today and signed me up to be the Classic Track Day Suspension Vendor. https://www.bradywalker.com/
See all the dates on my Calendar page.
Stone Table
It’s time to up-grade your stock shock. These are from an RC51, top and a ZX9 that is going on a ZX12. Rebuilt, re-valved and re-sprung. And yes, they are resting on top of a 2 foot by 3 foot stone table. The proper tool for making sure things are straight.
Vote!
I worked at my local polling station for this Primary Election. I’ll be back for the General Election in November.
Static Endurance Testing
When you put something on a shelf and forget about it.